Fringing. And fringing. And fringing.
Hanna’s poncho got it’s fringe on Wednesday already. Since the yarn is a blend of linen and viscose do drying take quite some time. I wet finished the poncho the same evening, but it wasn’t completely dry until Friday. We had guests over on Saturday, and Sunday was very rainy, but today there was sunshine in the morning, so I urged Hanna to pose for pictures before she left for school. So here it is, the poncho with a lot of fringe. I didn't even count them. That is a sign of a lot of fringe.
Projekt detaljer: 4 bollar Rowan Linen Drape i färg 847. Slätstickningen är gjord på stickor 5 mm. Jag plockade därefter upp i hals ringningen på stickor 4,5 mm, bytte halvvägs i flätan till 4 mm, och stickade resåren på 3,5 mm.
Project details: 4 balls of Rowan Linen Drape in shade 847. The stockinette part is knitted on needles 5 mm. I then picked up for the upper part on 4,5 mm, went down to 4 mm halfway down the cable, and knitted the ribbing with 3,5 mm.
Detalj av den övre delen/Detail of the upper part
Och födelsedagströjan avancerar. Ärmarna är klara, bakstycket är en bit förbi ärmhåls intagningarna. Phildar Aviso är ett något stumt garn, och det går lätt att få ont i armen av att länge sticka med det. Jag har lätt att sticka de aviga varven för löst, och måste alltid skärpa mig lite på den sidan. Men jag har stora förhoppningar att få tröjan klar i tid för födelsedagen.
The Phildar is also advancing. Both sleeves are done, and there is only about 8 cm left to knit on the back piece. I have a tendency to knit the purl rows a bit too loose, and must on every row deliberately try to knit them tighter. It’s a bit trying on the right arm, if knitting for long. But I have hopes to be able to get it ready in time for the birthday.
Comments
That poncho is fringerrific!
Posted by: Becky | May 15, 2006 04:07 PM
The poncho looks GREAT!
Posted by: Brenda | May 23, 2006 01:19 AM